The shape of a repair job #
A tenant reports a problem, usually in whatever channel is closest to hand: a portal, an email, a text, a voicemail, or a message to a negotiator's mobile. Somebody then has to work out:
-
Which property it is
-
Which tenancy
-
Whether the landlord has authorised work up to a limit
-
Whether it is covered by a warranty or a block management arrangement
-
Which contractor covers that trade in that area
Then the three way loop starts: contractor availability, tenant access, landlord approval.
Each round of the loop is cheap. There are just a lot of rounds, and every one of them is a context switch. This is why maintenance is the queue property managers describe as the one that never gets shorter: it is not heavy, it is high frequency and high interruption.
Half of it arrives when the office is shut #
Data from the maintenance system Lettie, covering 1 June to 31 August 2026 across a platform supporting more than 10,000 tenants and reported by Property Industry Eye on 15 September 2026, found that tenants logged half of all maintenance cases outside Monday to Friday, 9am to 5pm office hours.
17.4%
Of cases arrived at weekends
Lettie, reported by Property Industry Eye, 15 September 2026
73.1%
Of heating and hot water cases were reported outside normal office hours
Lettie, reported by Property Industry Eye, 15 September 2026
73.7%
Of loss of hot water cases were reported outside normal office hours
Lettie, reported by Property Industry Eye, 15 September 2026
57.5%
Of cases rated High or Emergency were reported outside weekday office hours
Lettie, reported by Property Industry Eye, 15 September 2026
That is a structural fact about the work, not a criticism of anybody's staffing. People notice a broken boiler when they get home. The consequence for an agency is that a significant share of the queue is created while nobody is reading it, and lands as a backlog at nine the next morning, mixed in with the enquiries. The evening end of this is covered in out of hours calls.
Which parts run on rules #
Runs on rules
- Capturing a report and matching it to a property and tenancy
- Acknowledging it so the tenant stops chasing
- Categorising by trade and routing to the right contractor list
- Checking it against the landlord's standing authorisation limit
- Chasing a contractor who has not confirmed, and the tenant who has not replied
- Updating tenant and landlord on progress, and closing the job
Needs a property manager
- Deciding whether a report is a genuine emergency
- Deciding whether damage is wear and tear or a tenant charge
- Telling a landlord their boiler needs replacing rather than repairing again
The line sits exactly where it sits everywhere else on this site. Routing, chasing and updating are rule driven. Judging severity, liability and cost is not, and should stay with a person who can be held to the decision.
Two rules that shape the work #
That single line explains why a repair visit cannot simply be booked into the first free slot, and why access is the stage most jobs stall at.
The direction of travel has one too. The Renters' Rights Act extends Awaab's Law to private rented homes, implying terms into tenancy agreements requiring landlords to address hazards within a specified time period, with the Decent Homes Standard applying to the vast majority of private rented homes.
Both are duties on the landlord, not something an agent can automate away. The administrative consequence, though, is that when a repair was reported and what happened next becomes a record that has to exist and be findable.
The record keeping problem underneath #
Most agencies can tell you what happened on a repair. Fewer can tell you quickly, from one place, with dates. Reports arrive in five channels, notes are kept in a CRM, photographs sit in a mailbox and the contractor's invoice is in accounts.
In a survey of lettings professionals reported on 3 September 2026, 61 per cent said staff transfer, re-enter or duplicate information between systems during a tenancy. Maintenance is where that costs most, because a repair history is exactly the thing that gets asked for months later.
A useful first measurement: take twenty closed jobs, and for each one count the number of messages sent and the elapsed time at each stage. Then ask which stage held the job longest. In most agencies it is access, not the repair. Inspections produce the same kind of follow up trail and are covered in property inspections. The free tools will turn the message count into hours.