Architecture practices
Architecture practices: where the admin actually sits
In a practice of a few architects, the work that repeats is rarely the drawing. It is the appointment that was never countersigned, the validation list, the consultant who has not sent their information and the client asking where things have got to. These pages say which of those jobs run on rules.
What the repeated admin looks like #
The RIBA Plan of Work 2020 splits a project into eight stages, from Strategic Definition to Use, each with its outcomes, core tasks and information exchanges. Every exchange is something a person in the practice has to send, chase and file. On a house extension or a shop fit out the sequence is the same every time.
-
The fee proposal becomes an appointment
Written terms before work starts and a signed copy that has to come back.
-
Meetings produce actions that somebody has to chase
The measured survey, the engineer’s input, the client’s decision on the kitchen.
-
The planning application is assembled and validated End of Stage 3
-
Drawings are revised, reissued and logged in the issue register
-
The building regulations paperwork starts Stage 4
Including who holds which dutyholder role.
-
A stage closes and an invoice should follow
Once somebody notices that it has.
Running through all of it is the client who wants to know where things are. The question arrives while the person who knows is at a site meeting.
What the regulator expects to exist on paper #
Several standards in the Architects Code that came into effect on 1 September 2025 are about administration. An architect meets Standard 4 when they "provide clear, understandable, written terms of engagement to their clients before commencing work" and "maintain accurate records of their work and decisions". Standard 5 adds communicating to clients, "in a timely manner, any issues that may impact the cost, time or quality of a project".
Planning: the work before the clock starts #
A valid planning application needs a completed form, the national information requirements, the correct fee and the local information requirements. Local requirements only count if they sit on a formally adopted local list published on the council’s website less than two years before the application goes in. Once an application is validated, the council should decide it within 13 weeks for major development and 8 weeks for most other applications, unless a longer period is agreed in writing. Time spent going back and forth over validation comes before that clock starts. A practice working across several council areas is checking against several lists.
Building regulations and the dutyholder paperwork #
In England the dutyholder and competence requirements have applied since 1 October 2023. GOV.UK guidance tells designers not to start design work "unless you are satisfied the client is aware of what their legal duties are". ARB says that advice should be in writing, with written confirmation sought from the client. If a domestic client appoints nobody, "the designer in control of the design phase of the project is the principal designer". A principal designer who stops being one must give the client a document explaining their arrangements within 28 days of the appointment ending. ARB’s building safety guidance asks for records showing how safety issues were "identified, considered, communicated and addressed". Work on a higher-risk building adds a great deal more.
How to tell which parts run on rules #
The test is whether two competent people, given the same inputs, would do the job the same way.
Runs on rules
- An appointment sent and not countersigned
- Information requested from a consultant and not received
- A drawing revised since it was last issued
- A pack checked against a council’s published local list
- A stage closed with no invoice raised
Needs an architect
- The design
- Whether a design, if built, would comply
- How a scheme is put to the planning officer
- The conversation when scope, cost or programme moves
The which tasks run on rules tool sorts the jobs a practice repeats into three groups: rules based, needs a person and needs a closer look.
Client data and AI tools #
A practice holds personal data on every client, down to drawings of the inside of their homes. Under UK GDPR the practice that decides why and how that data is processed is the controller. The ICO says a controller is "responsible for complying with the UK GDPR". The Architects Code puts it in professional terms: an architect meets Standard 4 when they "protect the confidentiality and security of information for which they are responsible". ARB also expects terms of engagement to say how data will be handled.
The 2025 Code does not mention AI by name. RIBA’s third member survey, published on 22 July 2026, found 74 per cent of practices using AI, up from 59 per cent in 2025. RIBA also said a policy for the responsible use of AI would be developed during the year. Neither changes the two duties above, which apply whichever tool touches the file. We point at ARB and the ICO rather than interpreting them. What UK GDPR means for AI tools covers the general position.
To put a number on the admin first, the cost of admin time calculator does that without asking you for anything.
Where these numbers come from
- ARB, The Architects Code: Standards of professional conduct and practice 2025, read 14 October 2026. In effect from 1 September 2025. Standards 4.1, 4.5, 4.6 and 5.4
- ARB, Terms of Engagement: supporting guidance, published 19 June 2025, read 14 October 2026
- ARB, Building Safety: supporting guidance, published 30 July 2026, read 14 October 2026
- RIBA Plan of Work 2020, template, read 14 October 2026
- GOV.UK, Making an application (planning practice guidance), read 14 October 2026
- GOV.UK, Determining a planning application, read 14 October 2026
- GOV.UK, Design and building work: meeting building requirements, read 14 October 2026
- The Building Regulations etc. (Amendment) (England) Regulations 2023, regulation 1, read 14 October 2026
- ICO, What are controllers and processors?, read 14 October 2026
- RIBA, AI adoption reaches tipping point across UK architecture, 22 July 2026, read 14 October 2026
Last checked 14 October 2026.
Our workings are on the methodology page.